Completed queue projects in Massachusetts (2014 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4543 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn61,807 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Canal 3
Gas
333 MWOperating Barnstable, MAISO-NE Mar 2014target 2019
Medway Peaker - SEMARI
Gas
208 MWOperating Norfolk, MAISO-NE May 2014target 2019
MATEP (Combined Cycle) Increase
Gas
1.7 MWOperating Suffolk, MAISO-NE Jan 2014target 2014
Glendale Hydroelectric Expansion Project
Hydro
0.2 MWOperating Berkshire, MAISO-NE Feb 2014target 2018

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)