Gas interconnection queue in Maryland

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown298.5 MW
Active in queue98.5 MW2 requests
Agreement signed0.0 MW0 requests
Withdrawn6431.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project AH1-744, Prince George's County
Gas Β· Parkway Generation Operating LLC
53.5 MWIn study Prince George's, MDPJM Apr 2025
Gas project AH2-269A, Prince George's County
Gas
45.0 MWIn study Prince George's, MDPJM Mar 2022target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)