United States β€Ί Grid β€Ί Interconnection queues β€Ί Maryland

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Maryland (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4174 MW
Active in queue57.6 MW2 requests
Agreement signed57.6 MW2 requests
Withdrawn10805 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
CPV Maryland
Gas
75.0 MWOperating Charles, MDPJM Sep 20172019
Rock Springs Units #3 & #4
Gas
60.0 MWOperating Cecil, MDPJM Jan 20172017
Ripley Solar
Solar
27.5 MWOperating Charles, MDPJM Mar 20172023
Calvert Cliffs Units 1 and 2 (f/k/a PJM Queue M04)
Nuclear
11.1 MWOperating Calvert, MDPJM Jan 20172023

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)