Completed queue projects in Maryland (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown683.9 MW
Active in queue4.0 MW1 requests
Agreement signed4.0 MW1 requests
Withdrawn55554 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Legore Bridge Solar Center Facility
Solar
20.0 MWOperating Frederick, MDPJM Oct 20152025
Pondtown Solar 1
Solar
19.8 MWOperating Queen Anne's, MDPJM Oct 20152022
Pondtown Solar 1
Solar
19.8 MWOperating Queen Anne's, MDPJM Oct 20152022
Biggs Ford Solar Facility
Solar
15.0 MWOperating Frederick, MDPJM Oct 20152025
Union Bridge Solar Facility
Solar
8.2 MWOperating Carroll, MDPJM Oct 20152022
Kingsville Solar
Solar
1.1 MWOperating Harford, MDPJM Mar 20152016

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)