United States β€Ί Grid β€Ί Interconnection queues β€Ί Maine

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Maine (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4271 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn11976 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Millinocket Frequency Conversion
Hydro
126 MWOperating Penobscot, MEISO-NE Feb 2015target 2019
Farminton Solar
Solar
78.4 MWOperating Franklin, MEISO-NE Aug 2015target 2021
Sanford Airport Solar
Solar
50.0 MWOperating York, MEISO-NE Dec 2015target 2020
Casco Bay Energy Storage
Battery storage
16.2 MWOperating Cumberland, MEISO-NE Nov 2015target 2016

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)