United States β€Ί Grid β€Ί Interconnection queues β€Ί Louisiana

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Louisiana (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4475 MW
Active in queue2,107 MW12 requests
Agreement signed1,075 MW3 requests
Withdrawn182,330 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project J1368, Pointe Coupee Parish County
Solar
200 MWOperating Pointe Coupee Parish, LAMISO Apr 20192023
Solar project J1205, Allen Parish County
Solar
125 MWOperating Allen Parish, LAMISO Apr 20192023
Solar project J1372, Pointe Coupee Parish County
Solar
100 MWOperating Pointe Coupee Parish, LAMISO Apr 20192023
Solar project J1436, Morehouse Parish County
Solar
50.0 MWOperating Morehouse Parish, LAMISO Apr 20192023

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)