Completed queue projects in Louisiana (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown31,217 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn4394 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project J484, Calcasieu Parish County
Gas
1,056 MWOperating Calcasieu Parish, LAMISO Sep 20152019
Gas project J481, Orleans Parish County
Gas
135 MWOperating Orleans Parish, LAMISO Sep 20152019
Gas project J482, St. Charles Parish County
Gas
26.2 MWOperating St. Charles Parish, LAMISO Sep 20152018

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)