πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Kentucky

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Kentucky (2016 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4309 MW
Active in queue309 MW4 requests
Agreement signed9.0 MW1 requests
Withdrawn6800 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project J762, Meade County
Solar
200 MWUnder construction Meade, KYMISO Nov 2016target 2021
Pike County Solar
Solar
50.0 MWPaused / redesign Pike, KYPJM Oct 2016target 2028
Pike County Solar
Solar
50.0 MWPaused / redesign Pike, KYPJM Oct 2016target 2028
Solar project LGE-GIS-2016-001, Clark County
Solar
9.0 MWAgreement signed Clark, KYSoutheast Mar 2016target 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)