Completed queue projects in Kentucky (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown3105 MW
Active in queue1,735 MW14 requests
Agreement signed1,445 MW12 requests
Withdrawn566,779 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Turkey Creek Solar
Solar
50.0 MWOperating Garrard, KYPJM Mar 20192022
Glover Creek Solar
Solar
35.0 MWOperating Metcalfe, KYPJM Feb 20192024
Glover Creek Solar
Solar
20.0 MWOperating Metcalfe, KYPJM Sep 20192024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)