Withdrawn queue requests in Iowa (2010 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown72,267 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn72,267 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project J116, Hancock County
Onshore wind
999 MWWithdrawn / abandoned Hancock, IAMISO Feb 2010target 2013
Onshore wind project J154, Washington County
Onshore wind
500 MWWithdrawn / abandoned Washington, IAMISO Jun 2010target 2011
Gas project J130, Hancock County
Gas
300 MWWithdrawn / abandoned Hancock, IAMISO Apr 2010target 2011
Gas project J162, Dallas County
Gas
270 MWWithdrawn / abandoned Dallas, IAMISO Sep 2010target 2012
Onshore wind project J114, Tama County
Onshore wind
150 MWWithdrawn / abandoned Tama, IAMISO Feb 2010target 2011
Onshore wind project J153, Johnson County
Onshore wind
30.0 MWWithdrawn / abandoned Johnson, IAMISO Jun 2010target 2012
Onshore wind project G976, Johnson County
Onshore wind
18.0 MWWithdrawn / abandoned Johnson, IAMISO Jun 2010target 2010

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)