United States β€Ί Grid β€Ί Interconnection queues β€Ί Iowa

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Iowa (2016 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5696 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn151,847 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project J748, Plymouth County
Onshore wind
200 MWOperating Plymouth, IAMISO Nov 20162021
Onshore wind project J583, Audubon County
Onshore wind
200 MWOperating Audubon, IAMISO May 20162021
Onshore wind project J555, Poweshiek County
Onshore wind
140 MWOperating Poweshiek, IAMISO Mar 20162017
Onshore wind project J590, Palo Alto County
Onshore wind
90.0 MWOperating Palo Alto, IAMISO May 20162019
Onshore wind project J614, Howard County
Onshore wind
66.0 MWOperating Howard, IAMISO May 20162018

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)