United States βΊ Grid βΊ Interconnection queues βΊ Illinois
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Illinois (2015 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Byron to Wayne Thermal #1 Project Gas |
575 MW | Withdrawn / abandoned |
| Gas project AB1-091, Kankakee County Gas |
575 MW | Withdrawn / abandoned |
| Gas project AB1-086, Mclean County Gas |
575 MW | Withdrawn / abandoned |
| Gas project AB1-090, Lee County Gas |
575 MW | Withdrawn / abandoned |
| Onshore wind project AB1-170, Grundy County Onshore wind |
250 MW | Withdrawn / abandoned |
| Solar project J463, Montgomery County Solar |
200 MW | Withdrawn / abandoned |
| Onshore wind project AA2-039, Henry County Onshore wind |
150 MW | Withdrawn / abandoned |
| Onshore wind project J474, Dewitt County Onshore wind |
144 MW | Withdrawn / abandoned |
| Battery storage project AB1-085, Kane County Battery storage |
20.0 MW | Withdrawn / abandoned |
| Battery storage project AA2-107, Dekalb County Battery storage |
20.0 MW | Withdrawn / abandoned |
| Gas project AA2-067, Boone County Gas |
10.0 MW | Withdrawn / abandoned |
| Gas project AA2-136, Kendall County Gas |
10.0 MW | Withdrawn / abandoned |
| Other project AB1-079, Lake County Other |
6.5 MW | Withdrawn / abandoned |
| Other project AB1-172, Will County Other |
6.2 MW | Withdrawn / abandoned |
| Battery storage project AB1-131, Will County Battery storage |
6.0 MW | Withdrawn / abandoned |
| Battery storage project AB1-146, Winnebago County Battery storage |
2.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)