United States β€Ί Grid β€Ί Interconnection queues β€Ί Illinois

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in Illinois (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown71,390 MW
Active in queue5,100 MW37 requests
Agreement signed3,710 MW30 requests
Withdrawn434,420 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Steward Creek Solar
Solar Β· Steward Creek Solar, LLC
300 MWIn study Lee, ILPJM Dec 2019target 2023
Black Diamond Solar
Solar Β· Black Diamond Solar Power, LLC
299 MWIn study Christian, ILPJM Mar 2019target 2022
South Dixon Solar
Solar Β· Deriva Energy Solar, LLC
200 MWIn study Lee, ILPJM Sep 2019target 2022
Gipper Wind Farm
Onshore wind Β· Gipper Wind Farm, LLC
191 MWIn study Whiteside, ILPJM Sep 2019target 2022
Bright Stalk Generating Facility
Onshore wind Β· Lexington Chenoa Wind Farm LLC
150 MWIn study Mclean, ILPJM Mar 2019target 2022
Plano Skies Energy Center
Solar Β· Plano Skies Energy Center, LLC
150 MWIn study Kendall, ILPJM Mar 2019target 2022
Plano Skies Energy Center
Solar Β· Plano Skies Energy Center, LLC
100 MWIn study Kendall, ILPJM May 2019target 2022

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)