United States β€Ί Grid β€Ί Interconnection queues β€Ί Illinois

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Illinois (2011 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9314 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn12879 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Hilltopper Wind Farm
Onshore wind
188 MWOperating Logan, ILPJM May 20112018
Onshore wind project J196, Vermilion County
Onshore wind
50.0 MWOperating Vermilion, ILMISO Feb 20112013
Coal project J232, Randolph County
Coal
35.0 MWOperating Randolph, ILMISO Nov 20112018
Orchard Hills Renewable Energy Station
Other
15.3 MWOperating Ogle, ILPJM Apr 20112016
City Solar
Solar
9.0 MWOperating Cook, ILPJM Aug 20112013
Countryside Landfill
Other
8.0 MWOperating Lake, ILPJM Jan 20112012
Dixon/Lee Landfill
Other
4.0 MWOperating Lee, ILPJM Jan 20112013
Dresden Nuclear Generation Station, Units 2 & 3
Nuclear
3.0 MWOperating Grundy, ILPJM Mar 20112013
Morris Landfill
Other
2.1 MWOperating Grundy, ILPJM Jan 20112013

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)