United States β€Ί Grid β€Ί Interconnection queues β€Ί Illinois

OCTARY USA Β· INTERCONNECTION QUEUES

Projects with signed interconnection agreements in Illinois (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4215 MW
Active in queue5,601 MW36 requests
Agreement signed215 MW4 requests
Withdrawn579,515 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Red Maple Solar
Solar
94.9 MWAgreement signed Adams, ILPJM Mar 2020target 2028
Twin Groves Storage II
Battery storage
50.0 MWAgreement signed Mclean, ILPJM Mar 2020target 2028
Twin Groves Storage I
Battery storage
50.0 MWAgreement signed Mclean, ILPJM Mar 2020target 2028
Wilmington Solar Energy Project
Solar + storage
19.9 MWAgreement signed Will, ILPJM Sep 2020target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)