Projects with signed interconnection agreements in Illinois (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown41,043 MW
Active in queue2,768 MW12 requests
Agreement signed1,043 MW4 requests
Withdrawn362,417 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Heritage Prairie Wind
Onshore wind
850 MWAgreement signed Kankakee, ILPJM Sep 2017target 2028
Three Rivers Energy Center
Gas
103 MWAgreement signed Grundy, ILPJM Jul 20172023
Staley Solar
Solar
50.0 MWAgreement signed Kankakee, ILPJM Mar 2017target 2027
Rochelle Solar
Solar
40.0 MWAgreement signed Ogle, ILPJM Apr 2017target 2028

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)