United States β€Ί Grid β€Ί Interconnection queues β€Ί Georgia

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Georgia (2010 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown56,712 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn56,712 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project IC-242, Putnam County
Gas
1,922 MWWithdrawn / abandoned Putnam, GASoutheast Aug 2010
Gas project IC-244, Hancock County
Gas
1,918 MWWithdrawn / abandoned Hancock, GASoutheast Aug 2010
Gas project IC-241, Putnam County
Gas
961 MWWithdrawn / abandoned Putnam, GASoutheast Aug 2010
Gas project IC-243, Hancock County
Gas
959 MWWithdrawn / abandoned Hancock, GASoutheast Aug 2010
Gas project IC-240, Coweta County
Gas
952 MWWithdrawn / abandoned Coweta, GASoutheast Aug 2010

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)