United States βΊ Grid βΊ Interconnection queues βΊ Florida
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Florida (2020 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project 380E, Jackson County Solar Β· Third Party |
80.0 MW | Withdrawn / abandoned |
| Solar project 276, Alachua County Solar Β· Masked |
74.9 MW | Withdrawn / abandoned |
| Solar project 278, Alachua County Solar Β· Origis Holdings USA Subco, LLC |
74.9 MW | Withdrawn / abandoned |
| Solar project 289, Alachua County Solar Β· Masked |
74.9 MW | Withdrawn / abandoned |
| Solar project 275, Polk County Solar Β· Masked |
74.9 MW | Withdrawn / abandoned |
| Solar project 69, Polk County Solar |
74.5 MW | Withdrawn / abandoned |
| Solar project 68, Polk County Solar |
74.5 MW | Withdrawn / abandoned |
| Solar project 73, Polk County Solar |
74.5 MW | Withdrawn / abandoned |
| Solar project 287, Manatee County Solar Β· Masked |
74.5 MW | Withdrawn / abandoned |
| Solar project 74, Polk County Solar |
74.5 MW | Withdrawn / abandoned |
| Solar project 280, Osceola County Solar Β· Masked |
74.3 MW | Withdrawn / abandoned |
| Solar project 279, Osceola County Solar Β· Hamel Renewables, LLC |
74.3 MW | Withdrawn / abandoned |
| Solar project 380D, Calhoun County Solar Β· Third Party |
20.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)