United States βΊ Grid βΊ Interconnection queues βΊ Florida
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Florida (2014 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Other project 129, Pasco County Other Β· Masked |
400 MW | Withdrawn / abandoned |
| Solar project IC-399, Santa Rosa County Solar |
40.0 MW | Withdrawn / abandoned |
| Solar project 10 Solar |
22.0 MW | Withdrawn / abandoned |
| Other project 133, Osceola County Other Β· Masked |
14.4 MW | Withdrawn / abandoned |
| Other project 132, Osceola County Other Β· Masked |
11.2 MW | Withdrawn / abandoned |
| Other project 134, Polk County Other Β· Masked |
10.0 MW | Withdrawn / abandoned |
| Other project 131, Polk County Other Β· Masked |
10.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)