πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Florida (2012 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown52,705 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn52,705 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Other project 118, Levy County
Other Β· Duke Energy Florida, LLC
1,211 MWWithdrawn / abandoned Levy, FLSoutheast Sep 2012target 2024
Other project 119, Levy County
Other Β· Duke Energy Florida, LLC
1,211 MWWithdrawn / abandoned Levy, FLSoutheast Sep 2012target 2025
Other project 116, Pasco County
Other Β· Masked
220 MWWithdrawn / abandoned Pasco, FLSoutheast Jan 2012target 2015
Other project 117, Polk County
Other Β· Masked
58.4 MWWithdrawn / abandoned Polk, FLSoutheast Jun 2012target 2014
Solar project 6
Solar
5.0 MWWithdrawn / abandoned FLSoutheast Apr 2012target 2011

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)