πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Delaware

OCTARY USA Β· INTERCONNECTION QUEUES

Projects with signed interconnection agreements in Delaware

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown350.0 MW
Active in queue874 MW16 requests
Agreement signed50.0 MW3 requests
Withdrawn10317.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Raceway Solar
Solar
20.0 MWAgreement signed Kent, DEPJM Mar 2017target 2025
Raceway Solar
Solar
20.0 MWAgreement signed Kent, DEPJM Mar 2017target 2025
Raceway Solar
Solar
10.0 MWAgreement signed Kent, DEPJM Apr 2017target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)