πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Connecticut

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Connecticut (2022 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown3317 MW
Active in queue317 MW3 requests
Agreement signed292 MW2 requests
Withdrawn8634 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar
Solar
150 MWAgreement signed Hartford, CTISO-NE Mar 2022target 2028
Battery Storage
Battery storage
142 MWAgreement signed Litchfield, CTISO-NE Oct 2022target 2029
Solar
Solar
25.0 MWIn study Hartford, CTISO-NE Apr 2022target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)