Gas interconnection queue in Arkansas

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown31,642 MW
Active in queue1,642 MW3 requests
Agreement signed0.0 MW0 requests
Withdrawn94,313 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project J3829, Hot Spring County
Gas
770 MWIn study Hot Spring, ARMISO Apr 2024target 2028
Gas project J3874, Union County
Gas
770 MWIn study Union, ARMISO Dec 2024target 2028
Gas project GEN-2024-003, Franklin County
Gas
102 MWIn study Franklin, ARSPP Apr 20242025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)