United States βΊ Grid βΊ Interconnection queues βΊ Arizona
OCTARY USA Β· INTERCONNECTION QUEUESGas interconnection queue in Arizona
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project Q32, Pinal County Gas |
928 MW | In study |
| Gas project 174, Pima County Gas |
800 MW | In study |
| Gas project 2023-G13, La Paz County Gas |
453 MW | In study |
| Gas project Q40, Maricopa County Gas |
425 MW | In study |
| Gas project Q2403, Maricopa County Gas |
398 MW | In study |
| Gas project Q519, Maricopa County Gas |
350 MW | In study |
| Gas project Q76, Pinal County Gas |
332 MW | In study |
| Gas project 2024-G2, Mohave County Gas |
200 MW | In study |
| Gas project Q37, Maricopa County Gas |
130 MW | In study |
| Gas project 2023-G2, Pinal County Gas |
90.0 MW | In study |
| Gas project Q31, Maricopa County Gas |
77.0 MW | In study |
| Gas project 2024-G6, Mohave County Gas |
50.0 MW | In study |
| Gas project Q66, Maricopa County Gas |
30.0 MW | In study |
| Gas project Q81, Maricopa County Gas |
30.0 MW | In study |
| Gas project Q65, Maricopa County Gas |
30.0 MW | In study |
| Gas project Q64, Pinal County Gas |
17.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)