Withdrawn queue requests in Arizona (2012 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6338 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn6338 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Palmas C5
Solar
238 MWWithdrawn / abandoned Yuma, AZCAISO Apr 2012target 2014
Solar project Q212, Yuma County
Solar
20.0 MWWithdrawn / abandoned Yuma, AZWest May 2012target 2014
Solar project Q215, Yavapai County
Solar
20.0 MWWithdrawn / abandoned Yavapai, AZWest Jun 2012target 2016
Solar project Q216, Maricopa County
Solar
20.0 MWWithdrawn / abandoned Maricopa, AZWest Jul 2012target 2014
Solar project Q26, Pinal County
Solar
20.0 MWWithdrawn / abandoned Pinal, AZWest Jul 2012target 2016
Solar project Q214, Maricopa County
Solar
20.0 MWWithdrawn / abandoned Maricopa, AZWest Jun 2012target 2014

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)