United States β€Ί Grid β€Ί Interconnection queues β€Ί Alabama

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Alabama (2014 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4287 MW
Active in queue465 MW3 requests
Agreement signed465 MW3 requests
Withdrawn4287 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project IC-388, Lowndes County
Gas
100 MWWithdrawn / abandoned Lowndes, ALSoutheast Jun 2014
Solar project IC-401, Macon County
Solar
80.0 MWWithdrawn / abandoned Macon, ALSoutheast Dec 2014
Other project 245, Jackson County
Other
80.0 MWWithdrawn / abandoned Jackson, ALSoutheast Jan 2014
Other project 247, Lauderdale County
Other
27.0 MWWithdrawn / abandoned Lauderdale, ALSoutheast Apr 2014

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)