OCTARY USA ยท INTERCONNECTION QUEUES

Completed queue projects in West (non-ISO utilities) (2022 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown10491 MW
Active in queue99.9 GW317 requests
Agreement signed12.2 GW66 requests
Withdrawn494132.6 GW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

10 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery storage project 657, Ada County
Battery storage ยท Kuna BESS LLC
150 MWOperating Ada, IDWest May 20222025
Gas project Q98, Pinal County
Gas
96.4 MWOperating Pinal, AZWest Sep 2022target 2024
Gas project SRP-Q98
Gas
96.4 MWOperating West Sep 2022target 2024
Battery storage project 638, Canyon County
Battery storage ยท Idaho Power Companyโ€šร„รฎPower Supply
80.0 MWOperating Canyon, IDWest Feb 2022target 2025
Gas project PIS005, Lincoln County
Gas ยท PacifiCorp
48.0 MWOperating Lincoln, WYWest May 2022target 2023
Hydro project 681, Jerome County
Hydro ยท Northside Energy Company, Inc.
10.0 MWOperating Jerome, IDWest Oct 2022target 2023
Hydro project 687, Lincoln County
Hydro ยท American Falls Reservoir District No. 2
4.8 MWOperating Lincoln, IDWest Nov 2022target 2023
Hydro project 679, Twin Falls County
Hydro ยท Lower Lowline LLC
2.8 MWOperating Twin Falls, IDWest Oct 2022target 2023
Hydro project 651, Ada County
Hydro ยท Arrowrock Hydroelectric Project
1.5 MWOperating Ada, IDWest Apr 20222022
Hydro project 637, Gooding County
Hydro ยท Faulkner Brothers Hydro
0.9 MWOperating Gooding, IDWest Feb 2022target 2022

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)