United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Texas, West (2024 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4550 MW
Active in queue550 MW4 requests
Agreement signed550 MW4 requests
Withdrawn00.0 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Co200B
Battery storage
200 MWAgreement signed El Paso, TXWest Mar 2024target 2027
Sf150SB
Solar + storage
150 MWAgreement signed El Paso, TXWest Mar 2024target 2027
Ne100B
Battery storage
100 MWAgreement signed El Paso, TXWest Mar 2024target 2027
Ne100S
Solar
100 MWAgreement signed El Paso, TXWest Mar 2024target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)