πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Queue projects under construction in Southeast (non-ISO utilities) (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7579 MW
Active in queue6,006 MW37 requests
Agreement signed3,957 MW18 requests
Withdrawn19937.4 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 130, Georgetown County
Solar
100 MWUnder construction Georgetown, SCSoutheast Jul 2019target 2021
Solar project 135, Georgetown County
Solar
100 MWUnder construction Georgetown, SCSoutheast Dec 2019target 2021
SR Metter
Solar
80.0 MWUnder construction Candler, GASoutheast Oct 20192022
Solar project 259, Highlands County
Solar Β· Placid Solar II, LLC
74.9 MWUnder construction Highlands, FLSoutheast May 2019target 2023
Solar project 258, Highlands County
Solar Β· Placid Solar, LLC
74.9 MWUnder construction Highlands, FLSoutheast May 2019target 2023
Solar project 273, Polk County
Solar Β· FL Solar 10, LLC
74.9 MWUnder construction Polk, FLSoutheast Dec 2019target 2022
Solar project 124, Aiken County
Solar
74.0 MWUnder construction Aiken, SCSoutheast Feb 2019target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)