United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Queue projects under construction in Southeast (non-ISO utilities) (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2155 MW
Active in queue2,517 MW28 requests
Agreement signed1,519 MW15 requests
Withdrawn20816.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 948720, Nash County
Solar Β· Duke Energy Progress, LLC
80.0 MWUnder construction Nash, NCSoutheast Jun 2017target 2025
Solar project 202.1, Levy County
Solar Β· FL SB 9, LLC
74.9 MWUnder construction Levy, FLSoutheast Oct 2017target 2021

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)