United States βΊ Grid βΊ Interconnection queues βΊ Missouri
OCTARY USA Β· INTERCONNECTION QUEUESQueue requests in study in Missouri, Southeast
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Onshore wind project GI-122, Randolph County Onshore wind |
500 MW | In study |
| Gas project GI-132, Butler County Gas |
460 MW | In study |
| Gas project GI-131, Randolph County Gas |
460 MW | In study |
| Gas project GI-126, Randolph County Gas |
460 MW | In study |
| Gas project GI-128, Clinton County Gas |
460 MW | In study |
| Solar project GI-127, Ralls County Solar |
80.0 MW | In study |
| Coal project GI-48, Randolph County Coal |
33.0 MW | In study |
| Coal project GI-43, Randolph County Coal |
28.2 MW | In study |
| Coal project GI-40, New Madrid County Coal |
20.0 MW | In study |
| Coal project GI-39, New Madrid County Coal |
20.0 MW | In study |
| Coal project GI-41, Randolph County Coal |
17.0 MW | In study |
| Coal project GI-42, Randolph County Coal |
1.7 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)38 Β· 10.5 GW
- SPP (Southwest Power Pool)35 Β· 7,615 MW
- Southeast (non-ISO utilities)12 Β· 2,540 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)