Withdrawn queue requests in Wyoming, SPP

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown3453 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn3453 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project GEN-2016-110, Platte County
Onshore wind
152 MWWithdrawn / abandoned Platte, WYSPP Nov 20162020
Onshore wind project GEN-2016-029, Platte County
Onshore wind
151 MWWithdrawn / abandoned Platte, WYSPP Mar 2016target 2017
Onshore wind project GEN-2016-023, Platte County
Onshore wind
151 MWWithdrawn / abandoned Platte, WYSPP Mar 2016target 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)