United States β€Ί Grid β€Ί Interconnection queues β€Ί Arkansas

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Arkansas, SPP

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown31,280 MW
Active in queue2,085 MW15 requests
Agreement signed633 MW5 requests
Withdrawn397,303 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project GEN-2001-024, Washington County
Gas
630 MWOperating Washington, ARSPP Jul 20012007
Coal project GEN-2006-010, Hempstead County
Coal
620 MWOperating Hempstead, ARSPP Feb 20062012
Coal project GEN-2013-011, Hempstead County
Coal
30.0 MWOperating Hempstead, ARSPP Mar 20132012

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)