United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in PJM (Mid-Atlantic, Midwest) (2023 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Battery storage project AJ1-037, Baltimore County Battery storage |
300 MW | Withdrawn / abandoned |
| Solar project AI2-438, Knox County Solar |
150 MW | Withdrawn / abandoned |
| Battery storage project AI2-113, Hanover County Battery storage |
100 MW | Withdrawn / abandoned |
| Onshore wind project AI2-053, Fayette County Onshore wind |
100 MW | Withdrawn / abandoned |
| Battery storage project AJ1-009, Essex County Battery storage |
60.0 MW | Withdrawn / abandoned |
| Solar project AI2-033, Sussex County Solar |
40.0 MW | Withdrawn / abandoned |
| Solar project AJ1-010, Mason County Solar |
35.0 MW | Withdrawn / abandoned |
| Solar project AI2-352, Northampton County Solar |
22.0 MW | Withdrawn / abandoned |
| Solar project AI2-031, Sussex County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project AI2-034, Sussex County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project AI2-032, Dinwiddie County Solar |
20.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- CAISO (California)486 Β· 198.6 GW
- West (non-ISO utilities)547 Β· 166.5 GW
- SPP (Southwest Power Pool)336 Β· 71.5 GW
- NYISO (New York)138 Β· 40.7 GW
- Southeast (non-ISO utilities)331 Β· 40.7 GW
- ERCOT (Texas)85 Β· 16.1 GW
- ISO-NE (New England)119 Β· 15.7 GW
- MISO (Midcontinent)10 Β· 1,143 MW
- PJM (Mid-Atlantic, Midwest)11 Β· 867 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)