πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Michigan

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Michigan, PJM (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown3435 MW
Active in queue435 MW3 requests
Agreement signed135 MW2 requests
Withdrawn4476 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Three Lakes Solar
Solar + storage Β· Three Lakes Solar LLC
300 MWIn study St. Joseph, MIPJM Sep 2019target 2022
Murch Solar
Solar
85.0 MWAgreement signed Van Buren, MIPJM Aug 2019target 2027
Decatur Battery Storage
Battery storage Β· Decatur Storage LLC
50.0 MWAgreement signed Van Buren, MIPJM Sep 2019target 2029

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)