United States β€Ί Grid β€Ί Interconnection queues β€Ί Michigan

OCTARY USA Β· INTERCONNECTION QUEUES

Projects with signed interconnection agreements in Michigan, PJM

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5410 MW
Active in queue1,996 MW18 requests
Agreement signed410 MW5 requests
Withdrawn182,816 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gemstone Solar
Solar
150 MWAgreement signed Cass, MIPJM Jan 2020target 2028
Southwest Michigan Energy Center
Solar
100 MWAgreement signed Van Buren, MIPJM Dec 2017target 2027
Murch Solar
Solar
85.0 MWAgreement signed Van Buren, MIPJM Aug 2019target 2027
Decatur Battery Storage
Battery storage Β· Decatur Storage LLC
50.0 MWAgreement signed Van Buren, MIPJM Sep 2019target 2029
Decatur Battery Storage
Battery storage Β· Decatur Storage LLC
25.0 MWAgreement signed Van Buren, MIPJM Aug 2020target 2029

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)