United States β€Ί Grid β€Ί Interconnection queues β€Ί Kentucky

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Kentucky, PJM (2023 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7169 MW
Active in queue169 MW7 requests
Agreement signed0.0 MW0 requests
Withdrawn00.0 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project AI2-333, Pike County
Solar
40.0 MWIn study Pike, KYPJM Mar 2023target 2026
Solar project AI2-335, Martin County
Solar
34.9 MWIn study Martin, KYPJM Mar 2023target 2026
Solar project AI2-334, Martin County
Solar
34.9 MWIn study Martin, KYPJM Mar 2023target 2026
Solar project AI2-374, Bath County
Solar
20.6 MWIn study Bath, KYPJM Mar 2023target 2025
Solar project AI2-342, Pike County
Solar
15.4 MWIn study Pike, KYPJM Mar 2023target 2027
Solar project AI2-404, Hart County
Solar
12.0 MWIn study Hart, KYPJM Mar 2023target 2025
Solar project AI2-349, Marion County
Solar
11.0 MWIn study Marion, KYPJM Mar 2023target 2029

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)