United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in NYISO (New York) (2025 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Lewis Run - Pierce Brook 230 kV Solar Β· RWE Solar Development, LLC |
240 MW | Withdrawn / abandoned |
| Farmers Valley βΓΓ¬ Ridgeway 115 kV Solar Β· RWE Solar Development, LLC |
200 MW | Withdrawn / abandoned |
| Lewis Run - Pierce Brook 230 kV Battery storage Β· RWE Solar Development, LLC |
170 MW | Withdrawn / abandoned |
| Seward-Glory 115 kV Solar Β· Clark Run Solar LLC |
100 MW | Withdrawn / abandoned |
| Pierce Brook-Lewis Run 230 kV Solar Β· McKean County Solar, LLC |
80.0 MW | Withdrawn / abandoned |
| Pierce Brook - Lewis Run 230 kV Solar Β· McKean County Solar, LLC |
80.0 MW | Withdrawn / abandoned |
| Tennessee Gas-East Towanda 115 kV Solar Β· Agnes Solar, LLC |
48.0 MW | Withdrawn / abandoned |
| East Towanda-South Troy 115 kV Solar Β· Franklin Energy, LLC |
31.0 MW | Withdrawn / abandoned |
| East Towanda-South Troy 115 kV II Solar Β· Franklin Energy, LLC |
20.0 MW | Withdrawn / abandoned |
| Pierce Brook - Lewis Run 230 kV Battery storage Β· McKean County Solar, LLC |
20.0 MW | Withdrawn / abandoned |
| Pierce Brook - Lewis Run 230 kV Solar Β· McKean County Solar, LLC |
20.0 MW | Withdrawn / abandoned |
| South Troy - North Towanda 34.5 kV Solar Β· Franklin Energy, LLC |
20.0 MW | Withdrawn / abandoned |
| Pierce Brook-Lewis Run 230kV Battery storage Β· McKean County Solar, LLC |
20.0 MW | Withdrawn / abandoned |
| Pierce Brook-Lewis Run 230kV Solar Β· McKean County Solar, LLC |
20.0 MW | Withdrawn / abandoned |
| Tennessee Gas-East Towanda 115 kV Solar Β· Agnes Solar, LLC |
10.0 MW | Withdrawn / abandoned |
| Oxbow 34.5 kV Solar Β· Field Brook Solar LLC |
9.8 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- SPP (Southwest Power Pool)99 Β· 26.5 GW
- MISO (Midcontinent)62 Β· 22.5 GW
- West (non-ISO utilities)75 Β· 20.5 GW
- PJM (Mid-Atlantic, Midwest)160 Β· 15.8 GW
- Southeast (non-ISO utilities)44 Β· 8,611 MW
- ERCOT (Texas)17 Β· 2,075 MW
- NYISO (New York)16 Β· 1,089 MW
- ISO-NE (New England)1 Β· 5.0 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)