Coal interconnection queue in MISO (Midcontinent)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4918 MW
Active in queue918 MW4 requests
Agreement signed550 MW1 requests
Withdrawn4821.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Coal project IP17, Franklin County
Coal
550 MWAgreement signed Franklin, ILMISO Dec 2001target 2002
Coal project G003, Trimble County
Coal
174 MWIn study Trimble, KYMISO Dec 1998target 2004
Coal project G002, Trimble County
Coal
174 MWIn study Trimble, KYMISO Dec 1998target 2016
Coal project J2081, Mississippi County
Coal
20.0 MWIn study Mississippi, ARMISO Aug 2021target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)