Interconnection queue in Missouri, MISO (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2500 MW
Active in queue500 MW2 requests
Agreement signed0.0 MW0 requests
Withdrawn4569 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project J1836, Callaway County
Solar
300 MWIn study Callaway, MOMISO Jun 2020target 2025
Solar project J1519, Bollinger County
Solar
200 MWIn study Bollinger, MOMISO Jun 2020target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)