Projects with signed interconnection agreements in Mississippi, MISO

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4402 MW
Active in queue12.8 GW65 requests
Agreement signed402 MW4 requests
Withdrawn13825.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project J1672, Hinds County
Solar
150 MWAgreement signed Hinds, MSMISO Jun 2020target 2025
Solar project J1748, Desoto County
Solar
100 MWAgreement signed Desoto, MSMISO Jul 2020target 2025
Solar project J604, Sunflower County
Solar
100 MWAgreement signed Sunflower, MSMISO May 20162022
Solar project J791, Lamar County
Solar
52.0 MWAgreement signed Lamar, MSMISO Apr 2017target 2020

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)