Completed queue projects in ISO-NE (New England) (2012 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown8802 MW
Active in queue4.6 MW1 requests
Agreement signed4.6 MW1 requests
Withdrawn10996 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Footprint Combined Cycle Unit
Gas
716 MWOperating Essex, MAISO-NE Jan 2012target 2013
Hancock Wind Project
Onshore wind
51.0 MWOperating Hancock, MEISO-NE Aug 2012target 2016
Weston Station AVR Replacement U2-4
Hydro
14.8 MWOperating Somerset, MEISO-NE Feb 2012target 2015
Westbrook Energy Center Expansion
Gas
9.5 MWOperating York, MEISO-NE Jan 2012target 2013
Bridgeport Fuel Cell 2
Gas
5.6 MWOperating Fairfield, CTISO-NE Jul 2012target 2013
Dighton Power Uprate
Gas
5.0 MWOperating Bristol, MAISO-NE Sep 2012target 2013
Mechanicsville Hydro Increase
Hydro
0.3 MWOperating Windham, CTISO-NE Oct 2012target 2013
Pisgah Mountain Increase (see Q349)
Onshore wind
0.1 MWOperating Penobscot, MEISO-NE Dec 2012target 2016

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)