OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in ERCOT (Texas) (2025 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9439 MW
Active in queue104.0 GW361 requests
Agreement signed4,428 MW22 requests
Withdrawn172,075 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
V2 Brooks Field DGR
Other Β· Life Cycle Power
76.5 MWOperating Bexar, TXERCOT Jun 20252025
P2 Highland Hills DGR
Other Β· Life Cycle Power
66.0 MWOperating ERCOT Jun 20252025
Z0 Beck Road DGR
Other Β· Life Cycle Power
60.0 MWOperating Bexar, TXERCOT Jun 20252025
K2 Nacogdoches DGR
Other Β· Life Cycle Power
58.0 MWOperating ERCOT Jun 20252025
A4 Pearsall DGR
Other Β· Life Cycle Power
58.0 MWOperating ERCOT Jun 20252025
V4 Palo Alto DGR
Other Β· Life Cycle Power
33.0 MWOperating ERCOT Jun 20252025
Q1 Valley Road DGR
Other Β· Life Cycle Power
29.0 MWOperating ERCOT Jun 20252025
Z5 Southton DGR
Other Β· Life Cycle Power
29.0 MWOperating ERCOT Jun 20252025
X1 Medina Base DGR
Other Β· Life Cycle Power
29.0 MWOperating ERCOT Jun 20252025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)