United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) (2022 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Ventana Energy Storage Battery storage |
254 MW | Withdrawn / abandoned |
| Pronghorn Energy Storage Battery storage |
123 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)494 Β· 132.6 GW
- MISO (Midcontinent)567 Β· 94.5 GW
- NYISO (New York)165 Β· 57.3 GW
- Southeast (non-ISO utilities)211 Β· 28.0 GW
- SPP (Southwest Power Pool)91 Β· 19.4 GW
- PJM (Mid-Atlantic, Midwest)182 Β· 19.3 GW
- ERCOT (Texas)76 Β· 15.5 GW
- ISO-NE (New England)98 Β· 12.0 GW
- CAISO (California)2 Β· 377 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)