United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in CAISO (California) (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5786 MW
Active in queue21.8 GW36 requests
Agreement signed19.4 GW33 requests
Withdrawn9539.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Plano Storage
Battery storage
365 MWOperating Monterey, CACAISO May 20192023
Peregrine Storage
Battery storage
200 MWOperating San Diego, CACAISO Apr 20192025
Rampa
Battery storage
101 MWOperating San Bernardino, CACAISO Apr 20192024
Pome BESS
Battery storage
100 MWOperating San Diego, CACAISO Apr 20192025
Resava Energy Storage
Battery storage
20.0 MWOperating San Diego, CACAISO Apr 20192021

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)