Completed queue projects in CAISO (California) (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown205,339 MW
Active in queue3,789 MW15 requests
Agreement signed3,789 MW15 requests
Withdrawn9112.3 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

20 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Mcfarland Solar
Solar + storage
935 MWOperating Yuma, AZCAISO Apr 20152025
Arlington
Solar + storage
652 MWOperating Riverside, CACAISO Apr 20152023
Slate
Solar + storage
617 MWOperating Kings, CACAISO Apr 20152022
Westlands Solar Blue
Solar + storage
477 MWOperating Kings, CACAISO Apr 20152023
Crimson
Battery storage
350 MWOperating Riverside, CACAISO Apr 20152022
Chestnut Westside
Solar + storage
287 MWOperating Kings, CACAISO Apr 20152023
Aquamarine Westside
Solar
250 MWOperating Kings, CACAISO Apr 20152021
Gateway Energy Storage
Battery storage
250 MWOperating San Diego, CACAISO Apr 20152025
Victory Pass Solar
Solar + storage
250 MWOperating Riverside, CACAISO Apr 20152024
Quartzite Solar 8
Solar + storage
225 MWOperating Riverside, CACAISO Apr 20152024
Black Diamond Energy Storage
Battery storage
200 MWOperating Contra Costa, CACAISO Apr 20152022
Rosamond South East
Solar + storage
192 MWOperating Kern, CACAISO Apr 20152025
Antelope Valley Complex
Solar + storage
170 MWOperating Kern, CACAISO Apr 20152025
Sun Streams Solar 2
Solar
150 MWOperating Maricopa, AZCAISO Apr 20152021
North Central Valley
Battery storage
132 MWOperating San Joaquin, CACAISO Apr 20152023
Valley Center Energy Storage
Battery storage
119 MWOperating San Diego, CACAISO Apr 20152021
Central 40
Solar
40.0 MWOperating Stanislaus, CACAISO Apr 20152021
Westlands Almond
Solar
19.9 MWOperating Kings, CACAISO Apr 20152023
Bear Canyon Energy Storage
Battery storage
13.3 MWOperating Lake, CACAISO Apr 20152024
Ultrapower Chinese Station BESS
Battery storage
10.0 MWOperating Tuolumne, CACAISO Apr 2015target 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)