United States β€Ί Grid β€Ί Interconnection queues β€Ί Nevada

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Nevada, CAISO

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown71,157 MW
Active in queue16.7 GW31 requests
Agreement signed8,618 MW16 requests
Withdrawn8328.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Silver State South Solar Project
Solar + storage
430 MWOperating Clark, NVCAISO Jun 20082016
Yellow Pine 2
Solar + storage
400 MWOperating Clark, NVCAISO May 2016target 2019
CMS2 (Fka Boulder City PV)
Solar
155 MWOperating Clark, NVCAISO Jul 20092015
Copper Mountain Solar 4
Solar
92.0 MWOperating Clark, NVCAISO Mar 20112016
Sunshine Valley Solar 2
Solar
50.0 MWOperating Nye, NVCAISO Apr 20132019
Silver State South Solar Project (Fka Silver State Solar II)
Solar
20.0 MWOperating Clark, NVCAISO Jul 20092016
Terra-Gen Dixie Valley Expansion (Fka Caithness Dixie Valley)
Geothermal
10.0 MWOperating Churchill, NVCAISO Jul 20042006

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)