United States βΊ Grid βΊ Interconnection queues βΊ Nevada
OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in Nevada, CAISO
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Silver State South Solar Project Solar + storage |
430 MW | |
| Yellow Pine 2 Solar + storage |
400 MW | |
| CMS2 (Fka Boulder City PV) Solar |
155 MW | |
| Copper Mountain Solar 4 Solar |
92.0 MW | |
| Sunshine Valley Solar 2 Solar |
50.0 MW | |
| Silver State South Solar Project (Fka Silver State Solar II) Solar |
20.0 MW | |
| Terra-Gen Dixie Valley Expansion (Fka Caithness Dixie Valley) Geothermal |
10.0 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)