πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Arizona

OCTARY USA Β· INTERCONNECTION QUEUES

Projects with signed interconnection agreements in Arizona, CAISO

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown66,499 MW
Active in queue23.0 GW22 requests
Agreement signed6,499 MW6 requests
Withdrawn4931.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Atlas Complex
Solar + storage
4,357 MWAgreement signed La Paz, AZCAISO May 2017target 2026
Centennial Flats
Solar + storage
767 MWAgreement signed La Paz, AZCAISO Apr 2018target 2026
Ironwood Solar
Solar + storage
500 MWAgreement signed Yuma, AZCAISO May 2017target 2026
White Wing Ranch Solar
Solar + storage
400 MWAgreement signed Yuma, AZCAISO Apr 2014target 2026
Dateland Energy Complex
Solar + storage
350 MWAgreement signed Yuma, AZCAISO Apr 2020target 2027
Saddle Mountain Solar
Solar
125 MWAgreement signed Maricopa, AZCAISO Apr 2020target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)