Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown25251.8 GW
Active in queue29.7 GW124 requests
Agreement signed7,888 MW34 requests
Withdrawn25251.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

252 requests · page 6 of 6
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project GEN-2016-040, Dekalb County
Onshore wind
18.4 MWWithdrawn / abandoned Dekalb, MOSPP Mar 20162016
Solar project GEN-2022-084, Jasper County
Solar
11.5 MWWithdrawn / abandoned Jasper, MOSPP Oct 2022target 2026
Page 6 of 6

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)