United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in Southeast (non-ISO utilities) (2025 requests) β page 6
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project 977889, Scotland County Solar |
5.0 MW | In study |
| Solar project 977892, Warren County Solar |
5.0 MW | In study |
| Gas project PP00020, Buncombe County Gas |
5.0 MW | In study |
| Battery storage project 976447, Mecklenburg County Battery storage |
4.1 MW | In study |
| Solar project 968543, Dillon County Solar |
4.0 MW | In study |
| Solar project 977896, Cleveland County Solar |
4.0 MW | In study |
| Solar project 977878, Marion County Solar |
3.2 MW | In study |
| Battery storage project 977422, Pender County Battery storage |
3.1 MW | In study |
| Solar project 968482, Anderson County Solar |
3.0 MW | In study |
| Solar project 972410, Anderson County Solar |
2.5 MW | In study |
| Solar project 966893, Spartanburg County Solar |
2.5 MW | In study |
| Solar project 968499, Greenwood County Solar |
2.0 MW | In study |
| Solar project 977127, Anderson County Solar |
1.5 MW | In study |
| Hydro project 977636, Anson County Hydro |
1.5 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)390 Β· 120.8 GW
- ERCOT (Texas)361 Β· 104.0 GW
- West (non-ISO utilities)325 Β· 84.1 GW
- SPP (Southwest Power Pool)268 Β· 71.3 GW
- Southeast (non-ISO utilities)264 Β· 42.0 GW
- PJM (Mid-Atlantic, Midwest)228 Β· 29.8 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)